Showing Reports From May 14, 2017 to Jul 02, 2018 Change Date Range
Or choose your own date range:
Categories

Revived PHC in Kwabial B, Zaria 0 Verified
14:47 Mar 07, 2018
The PHC has been revitalized, it now the control of National Tuberculosis and Leprosy training center.
The PHC has been Equipped.
More Information »
« Less Information
Categories

Irregular Power Supply 0 Verified
14:30 Mar 07, 2018
The Federal Government help them in painting of the fence, fixing widows, tiles, doors, PVC, Gate, part of it was interlocked. The PHC has...
More Information »
« Less Information
Ongoing renovation displaces the health centre to a substandard facility. 0 Verified
12:56 Mar 06, 2018
The renovation of this PHC started in May 2017. Though almost completed, it hasn't been opened. Since then, health care services are being...
More Information »
« Less Information
Well structured building without security and beddings for admissions. 0 Verified
12:49 Mar 06, 2018
Though there is good building, adequate security and beds for admission are lacking in this PHC. The borehole facility built is also not in...
More Information »
« Less Information
Renovated building with leaking roofing and a faulty water supply facility. 0 Verified
12:29 Mar 06, 2018
The building was last renovated in 2014, which worsened the situation of the PHC. Like most of the PHCs in the local government area, there...
More Information »
« Less Information
Total Reports | Avg Reports Per Day | % Verified |
---|---|---|
220 | 0.07 | 100% |